Bishop Challoner's New Classrooms

  • As Bishop Challoner's preferred installer we were commissioned to complete the work in their new classrooms, the installation consisted of the following:

    Installing a 12u wall mounted com's cabinet, to house 60 Cat 6 data outlets spread between 4 classrooms, with 2 x 48 port POE Ethernet switches. Linking to the rest of the schools network via a 4 core fibre optic link and connecting to the switches using SFP Gbix modules.

    Each of the 4 classrooms also have a 680 interactive SMART Board with a Casio XJ-A140 LED projector, a Sahara universal ceiling mount and Sahara 1050006 Wall Mounted speakers.

    All cables were installed into two compartment dado, including the VGA and Phono cables for the interactive boards. We had to work in conjunction with the builders to get the job completed before the 11th May. As a result we completed the work within 6 days from start to finish. It was commented that not only did we complete the work on time and on budget, but also with a professional fish, without any unsightly cables on display.